MIL-B-70511B (AR)
4.2.1.1 Sample. The contractor shall submit a first article
sample as designated by the Contracting Officer for evaluation in
accordance with provisions of 4.2.1.2. The first article sample
shall consist of-the assemblies, components and test specimens
listed below in the quantities indicated:
Quantity
Drawings
Part Description
10
11833491
Bolt, Automatic weapon:
(Practice) M2
4.2.1.2 Inspections to be performed. As determined by the
Government, the first article assemblies, components and test
specimens may be subjected to any or all of the examinations and
tests specified in this detail specification and be inspected for
compliance with any or all requirements of the applicable
drawings.
4.2.1.3 Rejection. If any assembly, component or test
specimen fails to comply with any of the applicable requirements,
the first article sample shall be rejected. The Government
reserves the right to terminate inspection upon failure of any
assembly, component or test specimen to comply with any of the
requirements.
7
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business