MIL-DTL-001298D (AR)
4.
VERIFICATION
TABLE II. Requirement/verification cross-reference matrix
METHOD OF VERIFICATION
CLASSES OF VERIFICATION
1 - Analysis
A - First article inspection
2 - Demonstration
B - Conformance inspection
3 - Examination
4 - Test
Verification
Verification
Section 4
Methods
Class/Qty.
Section 3 Requirement
Method
1234
A
B
3.1
First article inspection
4.2
XX
X
-
3.2
Conformance inspection
4.3
XX
-
X
3.3
Sear engagement
4.4
X
100%
100%
3.4
Firing pin protrusion
4.5
X
100%
100%
3.5
Headspace
4.6
X
100%
100%
3.6
Timing
4.7
X
100%
100%
100% 10-0-11
3.7
Firing pin release
4.8
X
3.8
Firing pin indent
4.9
X
100%
10-0-1
3.9
High pressure resistance
4.10
X
100%
100%
3.9.1
Magnetic particle inspection
4.10.1
X
100%
100%
3.10
Functioning
4.11
X
100%
100%
3.11
Belt pull
4.12
X
100%
100%
3.12
Cyclic rate of fire
4.13
X
100%
100%
3.13.1
Targeting and accuracy M2 Browning
4.14.1
X
100%
100%
machine gun flexible
3.13.2
Accuracy M2 browning machine gun
4.14.2
X
100%
100%
Turret type (M48 & M48 Series)
3.14
Endurance
4.15
X
3-0-1
1-0-1
3.15
Barrel Erosion
4.16
X
6-0-1
1-0-1
3.16
Interchangeability
4.17
X
10-0-1
10-0-1
3.16.1
Concurrent spare parts
4.17.1
X
6-0-1
2-0-1
3.17
Interplant interchangeability
4.18
X
6-0-1
6-0-1
3.18
Marking
4.19
X
100%
16-0-1
3.19
UID
4.20
X
100%
16-0-1
3.20
Hangfires and misfires
4.21
X
100%
100%
3.21
Workmanship
4.22
X
100%
16-0-1
Note:
1
Test ten (10) - Accept with zero (0) failures - Reject with one (1) failure.
4.1 Classification of inspection. The inspection requirements specified herein are as
follows.
a. First article inspection (4.2)
b. Conformance inspection (4.3)
351p10" style="font-size:12px">10
Downloaded: 2014-09-28T07:35Z
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business