MIL-DTL-45500E
4.5.3.5.2 Inter-plant. When guns with concurrent repair
parts are manufactured by more than one contractor, each
contractor shall forward monthly one gun and a sufficient
quantity of repair parts for the inter-plant interchangeability
test specified in 4.6.7.2 (see 6.2). The contractor shall be
informed of test results, which indicate failure of the gun or
parts to meet prescribed requirements.
4.5.3.6 Certification. Unless otherwise specified, the
contractor shall furnish the Government representative with
certified statements that each inspection lot of guns, parts and
assemblies shall conform to applicable drawings, specifications
of the materials and processes specified on the final assembly
drawing and applicable specification sheet.
4.5.3.7 Component parts and concurrent repair parts
testing. Raw material testing, part testing, and certification
shall be as specified in the contract (see 6.2). This will
include chemical analysis, physical tests of materials, tests of
protective finishes, heat treatment, bonding, and function of
parts as applicable. These tests shall be accomplished prior to
assembly of parts into the end item.
4.5.4 Packaging examination and testing. Unless otherwise
specified (see 6.2) the packaging examination and testing shall
be in accordance with MIL-P-14232.
4.5.5 Inspection conditions.
4.5.5.1 Inspection equipment. Unless otherwise specified in
the procurement documents (see 6.2), responsibilities for
acquisition, maintenance and disposition of measuring and testing
equipment prescribed on lists contained on the Index of
Inspection Equipment Lists specified on the applicable
specification sheet and for all other inspection equipment
required by applicable specifications, shall be in accordance
with commercial practices.
4.5.5.2 Ammunition feeding. The contractor shall be
responsible for feeding and driving the gun using Government
standard auxiliary equipment furnished on the contract (see 6.2)
or government approved, contractor furnished equipment.
4.5.5.3 Mounts. Unless otherwise specified, all firing
tests shall be accomplished with the gun affixed to a Government
approved mount (see 6.2). The mount shall have a rigidity of
approximately 50,000 pounds per inch deflection. The design of
the mount shall be such that the two recoil adapters carry all
the longitudinal load. The rear socket mounting of the end plate
or drive unit shall provide the rear mounting surface for the gun
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business